Boker · Code 01SC080

Magnum Long Lead EDC Folding Knife

★★★★★ Google 4,8 Heureka 100 % doporučuje obchod
Folding knife with safety mechanism and clip.
Knives Folding knives

Detailed product description

Magnum Long Lead EDC Folding Knife.

The Magnum Long Lead EDC is a classic gentleman’s and gourmet pocket knife for everyday use that immediately impresses with its simple, slightly curved design. The straightforward design is matched by the technical construction as a knife with a straight profile, which has proven itself millions of times thanks to its simple operation and lower number of components. The satin-finished blade made of 8Cr13MoV stainless steel features a flat grind, opens with a nail nick, and does not lock. The slightly contoured handle scales made of textured G10 sit comfortably in the hand. With clip (tip-down / right).

Opening: Manual

Lock: Slipjoint

Color: Black

Blade color: Uncoated

Customer reviews

You may also like

More →